Industrial data maturity checklist
Eight quick questions about your plant. Our team analyzes the answers and presents the full assessment in a 30-minute conversation.
What this material answers
- How many of the classic symptoms of fragmented architecture already exist in your plant.
- Which symptoms point to a collection problem and which point to a lack of context.
- What step to take first, based on the maturity level identified.
Contents
- 01The eight assessment questions, with an objective scoring criterion
- 02How to score each answer and reach the maturity level
- 03The four levels: point collection, broad collection, context, and governance
- 04What to prioritize at each level, without skipping steps
- 05Signs that the plant is ready to scale analytics and AI
Who it is for: Automation engineering, industrial IT, and leadership who need an honest picture of the current situation before approving a data project.
What Athenas solves on this topic
An assessment turned into a product
Each symptom in the checklist corresponds to an Athenas capability: collection, catalog, ISA-95 context, history, and observability.
Pilot with a defined scope
Based on the result, the initial scope becomes clear: one area, few sources, and a real consumer waiting for the data.
Measured evolution
The same criteria can be used to reassess maturity after implementation and show progress.
Other materials